Showing posts with label Entry into the Boiler. Show all posts
Showing posts with label Entry into the Boiler. Show all posts

Saturday, September 25, 2010

Entry into the Boiler


1.1. Apply  PTW procedure
2.2. Ventilation and purging for 24 hrs (min 12 hrs)
3.3. Use oxygen analyser before entry
4.4. Carry out a bag of necessary tool
5.5. Enter the boiler with your head first ( vertical boiler: enter with leg first)
6.6. Remember to open top manhole first then follow up with bottom manhole cover (to prevent hot air to hitting you)